Installation
Tools Required
Surface Preparation
Substrate should be solid, and ideally prepared to the original structural material.
Whenever applying Easycove® coving over a previously painted surface, the bond will only be as good as the coating that Easycove® is adhered to.
Easycove® coving should be applied at operating temperature of that room whenever possible.
Once Easycove® cove is removed from the box, it should be stored in a warm area, completely flat. A hot air gun may be helpful to let the material relax.

Easycove® Coving Installation
Once substrate is prepared, measure and cut the Easycove® coving to the desired length.
Apply Easycove® recommended adhesive to the DoveLock™ dovetail interlocking bond channels
Easycove® coving should be applied at operating temperature of that room whenever possible.
Once Easycove® cove is removed from the box, it should be stored in a warm area, completely flat. A hot air gun may be helpful to let the material relax.
Finishing
Using a clean cloth and isopropyl alcohol, wipe down the face to remove any dirt or contaminants and then apply epoxy in the same manner you would troweled cove using brush, roll or spray.
Decorative flakes may be broadcast onto the cove creating a seamless cove to floor look.